How To Measure Area For Stockpile Of Rock

  • PC33 TOPSOIL MANAGEMENT

    PC33 TOPSOIL MANAGEMENT

    Stripping, stockpiling, and reusing topsoil on construction projects is essential for proper reclamation of disturbed areas. Appropriate Appliions Topsoil is recommended on all disturbed sites and slopes 2H:1V or flatter, or as a planting medium for plantings or nursery stock. Topsoil may be added to a rock mulch to enhance slope

  • INTERMEDIATE ROCK STOCKPILE TYPE GENERAL AQUIFER ...

    INTERMEDIATE ROCK STOCKPILE TYPE GENERAL AQUIFER ...

    The Intermediate Rock Stockpile will be loed at RCML's West Plant Site, immediately north of the ... The maximum height will be approximately 100 feet as measured from the downhill toe of the stockpile and approximately 50 feet as measured from the uphill toe of the stockpile. The slope angles will range from :1V to 3H:1V (horizontal ...

  • Flora, Fauna and Net Gain Assessment of the Big Hill and ...

    Flora, Fauna and Net Gain Assessment of the Big Hill and ...

    areas, the Temporary Waste Rock Stockpile (TWRS) area, future haulage roadside and additional areas as part of the proposed extension of the Stawell Gold Mine, Stawell, Victoria. The aim of the assessment was to identify the type, quality and quantity of native vegetation and fauna habitat present within the study area.

  • Practical waste rock dump and stockpile management in high ...

    Practical waste rock dump and stockpile management in high ...

    Practical waste rock dump and stockpile management in high rainfall and seismic regions of Papua New Guinea N Bar Gecko Geotechnics Pty Ltd, Australia J Semi Ok Tedi Mining Limited, Papua New Guinea M Koek Ok Tedi Mining Limited, Papua New Guinea G OwusuBempah Harmony Gold Mining Company Limited, Papua New Guinea A Day Harmony Gold Mining Company Limited, Papua New .

  • METHOD FOR ESTIMATING IN REALTIME STOCKPILE PARTICLE .

    METHOD FOR ESTIMATING IN REALTIME STOCKPILE PARTICLE .

    A method for performing a realtime estimation of the particle size distribution in the outer surface of a stockpile is provided. The method involves combining information about realtime stockpile volumes, rock parameters, and measures of particle size distribution obtained over a period of time which is long enough to provide consistent operational data points.

  • VOLUME COMPUTATION OF A STOCKPILE – A STUDY CASE COMPARING ...

    VOLUME COMPUTATION OF A STOCKPILE – A STUDY CASE COMPARING ...

    Visual inspection of the generated stockpile surface showed strong correlations with the actual pile within the open area, and the volume of the pile in the semiconfined area was accurately measured.

  • Tipping and dumping audit guide

    Tipping and dumping audit guide

    Tipping and dumping audit – guide Page 2 of 12 Introduction This document was originally published in February 2008 under the title Guide to tipping HIF audit 2008. Changes made in March 2017 were the inclusion of audit point and minor typographical updates.

  • Calculating gravel tonnage, cubes, and sand and earth.

    Calculating gravel tonnage, cubes, and sand and earth.

    3 What area do I need? How much coverage area is a square kilometer, compared to an Acre? Convert Areas to and from metric, British units {acres, townships, square miles, square feet, etc.}, scientific units, archaic units, international units, and so forth.

  • Soil and Rock

    Soil and Rock

    Soil or rock from the borrow expands when dropped on the lorry or the landfill or stockpiled. One cubic from the borrow does not translate to one cubic dump. Bulking or swell factors for some materials: Material. Density at the Borrow. 103. (kg/m3) Bulking (Swell) Factor.

  • Calculating Pit Volumes

    Calculating Pit Volumes

    red. Since the Polyworks software will calculate the volume for any area that is selected, it is important that care be taken in selecting the area to be included in the volume calculation. For example, if the user chooses the extended areas around the stockpile (buildings and other structures) an erroneous volume will be calculated. This will ...

  • How to Use a Drone to Measure Stockpiles

    How to Use a Drone to Measure Stockpiles

    Using drones to measure stockpiles is quickly becoming a goto surveying workflow for earthwork sites around the world. For professionals in the mining and aggregates industries, stockpile inventory management is one of the primary use cases for drone surveying. Construction sites also use drones to survey their sites more quickly. The 3D maps generated from those flights collect actionable ...

  • Hightech solutions in quarry design and stockpile ...

    Hightech solutions in quarry design and stockpile ...

    22/09/2020 · The volume measurement of the broken rock stock allows the quarry to estimate when the next blast will need to be done, leading to better planning and a more efficient operation. Drones are just some of the innovations assisting quarries with pit design, stockpile measurement and .

  • Manure Stockpiling Guidelines

    Manure Stockpiling Guidelines

    As mentioned before, the stockpile must also contain at least 15% solids. This eliminates the possibility of stockpiling true liquid manure. It is important to note that the use of rock quarries, gravel pits, or mining excavation sites is prohibited. Another point in the rules is that the size of the stockpile must not exceed a volume greater ...

  • Seal Coat and Surface Treatment Manual: Stockpiling Aggregate

    Seal Coat and Surface Treatment Manual: Stockpiling Aggregate

    Area Preparation If necessary, the Contractor may be required to prepare a stockpile area before the aggregate is placed on it. He may be required to level it with a dozer or motor grader, and to clear it of any debris, such as vegetation, rocks, and sticks.

  • Obtaining stockpile measurements: A costeffective ...

    Obtaining stockpile measurements: A costeffective ...

    10/02/2014 · Obtaining stockpile measurements: A costeffective solution. With tripod mounted laser systems now accepted in the industry, quarry owners are seeking a new, more efficient and accurate approach to stockpile. The latest mobile laser scanning technology offers quarry operators a more efficient, safe and costeffective solution.

  • Compare stockpile volumes over time, online | Pix4D

    Compare stockpile volumes over time, online | Pix4D

    11/11/2019 · The Volume Comparison feature can be used across a wide variety of projects. Some of the most common appliions are: Measure stockpiles for active stockpiles knowing the change of volumes over time is important. The Volume Comparison tool of Pix4Dcloud Advanced allows you to measure the difference and know exactly what was moved and how much.

  • How to mitigate spontaneous combustion in Coal stockpiles?

    How to mitigate spontaneous combustion in Coal stockpiles?

    b) However, in case of increasing temperature or suspected combustion in the stockpile, measuring frequency should be increased to 3 (three) times per day (1 (one) time per every shift) ...

  • Gravel Calculator | How much gravel do you need?

    Gravel Calculator | How much gravel do you need?

    19/08/2019 · Sector 2: the area is equal to 4 yd multiplied by yd, which gives 2 yd². Sector 3: the area is equal to 4 yd multiplied by yd, which gives 10 yd². Sector 4: the area is equal to 10 yd multiplied by yd, which gives 6 yd². We have to sum up these four different areas to get the area of the whole yard.

  • Management of Tips and Stockpiles

    Management of Tips and Stockpiles

    The output of a quarry will have an influence on the siting, type and size of stockpile. The angle of repose of the stockpiled material must be taken into account; The area available and required. The size of the area, irrespective of the type of stockpile, must be sufficient for mobile equipment to operate when dumping and loading out.

  • Guidelines for Mine Waste Dump and Stockpile Design (2017 ...

    Guidelines for Mine Waste Dump and Stockpile Design (2017 ...

    Chapter Outlines. This book, Guidelines for Mine Waste Dump and Stockpile Design, is the third book in the LOP Guideline Series and focuses on the investigation, design, operation and monitoring of waste dumps, dragline spoils and stockpiles associated with large open pit book has been written by a consortium of geotechnical consultants and individuals including Piteau Associates ...

  • Stockpile Volume Calculator

    Stockpile Volume Calculator

    Enter the required parameters. The calculator will provide the maximum stockpile volume that can be created by a conveyor.

  • Estimating Excavation Revised

    Estimating Excavation Revised

    ment costs per unit. We'll also consider soil and rock properties and how the equipment you use affects bid prices. Why Calculate Quantities? In the past, many smaller dirt jobs were bid on a lumpsum basis rather than by the cubic yard. Dirt contractors based their bids on guesses: What equipment will I need and how long should it take?

  • Method for measuring density of a bulk material in a stockpile

    Method for measuring density of a bulk material in a stockpile

    article{osti_, title = {Method for measuring density of a bulk material in a stockpile}, author = {Cowherd, D C and DeWitte, J L and Taylor, K A and Whitaker, W C and Wolfe, Ce A}, abstractNote = {A method for determining the density of coal or other bulk material in a stockpile includes boring a calibration hole into the pile and collecting at least a portion of the cuttings thus ...

  • STOCKPILE MANAGEMENT

    STOCKPILE MANAGEMENT

    Staying on Top of Stockpile Management Smarter, quicker solutions emerge for measuring and controlling stockpile size and quality By Russell A. Carter, Contributing Editor As part of a contract valued at 170 million, thyssenkrupp will build and install two stockpile stackers and a reclaimer for BHP's South Flank iron ore project in Western ...